Lot 2: Lyngby and Geding
The “Road and Bridge Mid–North” section of the motorway includes the widening of the E45 Østjyske Motorvej between Lyngby and Geding.
Our work includes:
• Widening each carriageway from two lanes to three over approximately 6 km
• Reconstruction of TSA 47 Tilst (at Viborgvej) with modifications to the slip roads
• Construction of a new underpass for pedestrians and cyclists at True Skov
• Widening of bridges at Lyngbygårdsvej and Viborgvej and retaining walls at Geding Byvej
• Widening of the Blankhøj and Pedersminde rest areas
Additional work
We are also performing foundation work, including piling, installation of hot-dip galvanised HEB profiles and anchor installations. Additionally, we are handling drainage and utility works, including over-pumping services, pipe lining, guided directional drilling and pipe jacking. All these tasks are managed by our infrastructure department, while our construction department is responsible for concrete works on bridges and retaining walls, including waterproofing.
The contract also includes all paving works such as asphalt laying, paving and road markings, as well as final installations of noise barriers, guardrails, fences, signs and portals.