Closed Front Tunnelling
The closed front method is the optimal choice when tunnelling in permeable soil types beneath groundwater or in soil with a high stone content. This method is particularly suitable for crossing railways, light rail systems, protected areas, buildings, busy roads, and bridges. We prioritise safety above all else in our work, which is why we have no personnel inside the tunnel boring machine or the tunnel itself, effectively eliminating the risk of workplace accidents during tunnelling operations. We are the only Danish contractor with a centrifuge capable of separating water from the excavated muck. This means that the muck from our tunnelling operations is stackable and cheaper to dispose of, due to its low water content. The centrifuge is also a sustainable and environmentally friendly solution, as we recycle the water within the slurry system