Key facts:
Infrastructure and paving: 300,000 m²
Sewage, drainage and utility pipelines: 50 km
Asphalt: 100,000 m²
Topsoil removal: 125,000 m³
Construction of noise barriers: 125,000 m³
Infrastructure and paving: 300,000 m²
Sewage, drainage and utility pipelines: 50 km
Asphalt: 100,000 m²
Topsoil removal: 125,000 m³
Construction of noise barriers: 125,000 m³